Aberdeen Ferryhill. En-route from Inverurie Works to Edinburgh.
Off works dates 19/5/1960 – HI- AWS fitted. 2/9/1960 - N/C. 23/3/1961 – N/C. 6/6/1962 - G. 7/8/65 HI.
Date to be determined by experts of Inverurie paint liveries. The steel vacuum pipe is only painted red up to the fixing clip on the buffer beam. After 65920’s works visits in 1960 & 1965 the red paint extended above the top of the buffer beam