332 1950 Swindon Works
Ex-Brecon & Merthyr 0-6-2T in scrap-yard at Swindon Works as re-built by the GWR with a new boiler. One of 47 Brecon & Merthyr Railway locomotives acquired by the GWR in 1922, renumbered and 'Swindonized', No. 332 was built as BM No. 38 in 12/1909 and lasted only until 12/49.