Keywords:BR, BW, Class 42, Diesel, Hydraulic, Warship
Photo Info
Dimensions3776 x 2572
Original file size2.3 MB
Image typeJPEG
Color spaceUnknown
Date modified3-Jul-15 11:19
D808 824 1969-10-31 Dawlish
Double-heading the Up Cornish Riviera Peter Kerslake adds "Double-headed workings of the Warships began in May 1968 which allowed selected Plymouth-London trains loading to eleven coaches to be accelerated. This was short-lived and a year later all except the Cornish Riviera were reduced to a maximum of eight or nine coaches which was within the capabilities of a single Western".