One of the post 1892 builds with smaller cab cutouts ans later tenders with parallel sided relieving holes but with a short chimney from a F3. Westinghouse and vacuum brakes and steam heat fitted loco, note the lagged pipe along the right hand footplate angle. There is a large D chalked on the cabside -perhaps meaning depot duties