Thank you for your patience while we retrieve your images.
Taken 12-Aug-21
Visitors 508


44 of 45 photos
Thumbnails
Info
Categories & Keywords

Category:
Subcategory:
Subcategory Detail:
Keywords:
Photo Info

Dimensions3209 x 2252
Original file size2.78 MB
Image typeJPEG
Color spacesRGB
Date modified13-Aug-21 06:56
92097 1964-07 South Pelaw Junction

92097 1964-07 South Pelaw Junction

9F 2-10-0 No 92097 at Pelaw South Junction with a coal train for Consett in July 1964. The gradients on the Consett line were such that even a 9F could not manage such a long train of coal hoppers so, as a result the trains were either split at South Pelaw or banked. Here it is the former.
The brake van is at the rear of the rest of the train visible behind 92097. The wagons coupled behind the 9F are being shunted into the sidings in the background after which the 9F will take the remaining wagons up to Consett then return, with the brake van for the remainder of the train.

John Donnelly says the the iron ore trains were always banked as were the oil trains (although that banker was already on the train when it arrived at South Pelaw). He has not seen any photos of a coal train being banked therefore splitting as seen here was probably the normal proceedure.

Photo: W.J. Verden Anderson/Keith Verden-Anderson