As they were PW equipment could they be used by non BR drivers. The one at Radyr was driven by the PAD staff both at Radyr and also by them when it went out on track relying jobs with the Track Relaying Machine (TRM), it was unpowered and they used the PWM shunter to move or propel it when laying track sections or loading them