D7523 1965-03-26 Ratcliffe on Sour
Te driver and second man take a look at the building work from the cab of BR/Sulzer Type 2 No D7523 as it passes Ratcliffe on Soar with the power station under construction whilst hauling an up class '4' freight on 27th March 1965. The power station is the last coal fired one in operation and is planned to close in September 2024.
Photo: T.G. Hepburn/Rail Archive Stephenson