D2103 1969-03-22 Newcastle Station
D2103 looks over some demolition work at Newcastle Station.
When 08s were used at Newcastle Station they didn't need a runner to activate the train detection system. They did however need double manning, due to the curvature and signals being on either side, so were only used if an 03 wasn't available.