D2397 1970s Weymouth
Does anyone know the 'rules' about when the traffic over the quay was class 33 hauled or when a 03 shunter was used, or was it a driven by the transfer of the 03 shunting locos away? David Simpson says In answer to the question - The 33's replaced the 03's for the journey from Weymouth Junction to the quay around 1973 following trials using 33's. this enabled the Channel Islands boat trains to complete their journey without a second loco change (the first having taken place at Bournemouth from an ED Class 74 to a 33/1 for the trip to Weymouth). Following this the 03's were transferred away and the 33's worked the trains to the quay until the end of traffic - though 31's and 37's also appeared on specials, as did 73's from time to time -including one memorable double header on a service train after a 33 failure!