75006 1963 Approaching Garneddwen Halt
Approaching Garneddwen Halt between
Drws-y-Nant & Llanuwchylln on a stopper from Barmouth. The bridge in the distance
is the Bala-Dolgellau Road, this was the summit of the GWR Barmouth to Ruabon line. By this time the signal box at Garneddwen Halt was still open ceasing operations on the 4th November 1963. Soon after the signal arms were removed and trains used the former 'Up' loop line in both directions. The box was finally removed in October 1965 when a works train from Barmouth ran to the site to remove the point work for use elsewhere. Carrying an 89B Croes Newydd shed plate so after March 1963 and before November of the following year when it was transferred to Stoke.