D601 1958-05-15 Dainton
You can see right through the tunnel including the gradient change. On this day D601 was working 2 test trains between Newton Abbot and Plymouth.Trains were loaded to 13 vehicles including a Dynamometer Car giving a total of 439 tons.Two runs were made in each direction, the first being non-stop each way. On the second pair of runs the train was brought to a stand on the steepest part of Dainton and Rattery on the down and on the up on Hemerdon and Dainton.