60155 1963-09 Darlington Shed
Both locos are waiting to enter Darlington Works.
60155 will receive a Heavy Casual Overhaul.
The Q6, 63375, will be less fortunate, as its next move will be into the scrapyard.
The building in the background is the Darlington Breakdown Crane shed.