Thank you for your patience while we retrieve your images.
Taken 22-Feb-13
Visitors 570


96 of 292 photos
Thumbnails
Info
Categories & Keywords

Category:Transportation
Subcategory:Railway
Subcategory Detail:
Keywords:BR, BR Sulzer Type 2, BW, Birmingham, Class 24, Diesel, West Midlands
Photo Info

Dimensions3312 x 1992
Original file size2.32 MB
Image typeJPEG
Color spaceUncalibrated
Date modified22-Feb-13 16:13
D5023 1965 Tyseley

D5023 1965 Tyseley

What is going on here….. a serious accident is about to occur if that spilt oil is not cleaned up !

Typical pre-1974 H&S Act scene, with loose wooden plank for crossing inspection pit. If Vics my memory is correct then the pipe under the raised skirting is connected to the engine block coolant filler/drain valve. The radiator filler/drain valve is to the right of the cab step directly above the vertical speedo cable. The equipment on the wheeled trolley may be a hose drum for the hose to be wrapped round for storage purposes. The other two skirtings have been raised to enable the battery boxes to pulled out for battery maintenance.

Thanks Vic -I knew you would know!